Concrete Calculator

Concrete volume before allowance · Concrete volume including allowance · Whole bags needed

Concrete Calculator

Concrete volume before allowance—
Concrete volume including allowance—
Whole bags needed—

For rectangular sections. The number of bags needed is rounded up to the next whole bag.

How the calculation works

Method

The concrete volume is calculated from length, width and thickness. A set reserve increases the order quantity. For bagged goods, the requirement is divided by the stated yield and rounded up to whole bags.

Worked example

A slab measuring 3 m × 2 m × 0.1 m requires 0.6 m³ of concrete. With 10% reserve it is 0.66 m³ or 660 liters.

Understanding the result

Check the yield of the specific product and the actual installation thickness. Load-bearing capacity, subsoil and reinforcement are not determined by the quantity calculation.